Below are the anticipated infrastructure improvements occurring through 4/25/2018. This work includes the following:
Work to be performed Saturday, 4/21/2018:
- Iowa / Sunnyvale – St. Francis Electric performing infrastructure work demo & place conduit.
- Mathilda / McKinley – pothole for foundations (working off side streets on McKinley).
- Sunnyvale / McKinley – pothole for foundations.
- Block 5 Building T – Reinforcing steel and formwork for walls and columns.
Mathilda –
- Washington / Saturday 4/21/18 deep lift, lanes shutdown
- Iowa / demo pour back center island nosing
- McKinley / pothole for signal pole foundations
Iowa –
- S-Murphy/ continue crosswalk
Sunnyvale –
- Iowa / continue signal pole infrastructure
- McKinley / continue east crosswalk.
Washington –
- Begin water line, saw cut demo & excavate starting Monday 4/23